Project Overview

Once construction concludes for the New Performing Arts Complex, Building 1100 and its connecting bridge will be demolished, limiting access to the second floor of Building 100. A new elevator will be installed inside Building 100 to re-establish access and ensure conformity with Americans with Disabilities Act requirements. Work within the historically designated structure will maintain the historic features of the campus core in accordance with Historic Preservation code. Construction is anticipated to start in Winter 2026 and conclude in fall 2027.

 

Status: Bidding 

Project Costs: Measure J=$4,00,000

Architect of Record: Westberg White

Project Manager: John Erickson

General Contractor: TBD

Construction Manager: N/A

Program Management: MAAS Companies

Bidding Start: October 2026

Bidding Completion: November 2026

Building 100 Site 

map_20260822 (2)

Q4 2026 Project Update

 October

A project was recently brought under the Measure J fold to restore access to the second floor of Building   100 upon the demolition of Building 1100 and its connecting bridge are demolished. A new elevator will   be installed inside Building 100 to re-establish access and ensure conformity with Americans with   Disabilities Act requirements. Work within the historically designated structure will maintain the historic   features of the campus core in accordance with Historic Preservation code. Construction is anticipated to start in Winter 2026 and conclude in fall 2027.