Project Overview
Once construction concludes for the New Performing Arts Complex, Building 1100 and its connecting bridge will be demolished, limiting access to the second floor of Building 100. A new elevator will be installed inside Building 100 to re-establish access and ensure conformity with Americans with Disabilities Act requirements. Work within the historically designated structure will maintain the historic features of the campus core in accordance with Historic Preservation code. Construction is anticipated to start in Winter 2026 and conclude in fall 2027.
Status: Bidding
Project Costs: Measure J=$4,00,000
Architect of Record: Westberg White
Project Manager: John Erickson
General Contractor: TBD
Construction Manager: N/A
Program Management: MAAS Companies
Bidding Start: October 2026
Bidding Completion: November 2026
Building 100 Site
Q4 2026 Project Update
October
A project was recently brought under the Measure J fold to restore access to the second floor of Building 100 upon the demolition of Building 1100 and its connecting bridge are demolished. A new elevator will be installed inside Building 100 to re-establish access and ensure conformity with Americans with Disabilities Act requirements. Work within the historically designated structure will maintain the historic features of the campus core in accordance with Historic Preservation code. Construction is anticipated to start in Winter 2026 and conclude in fall 2027.