Update/Improve Infrastructure Central Plant Upgrades

Upgrades to the existing central plant have been made to enhance temperature control throughout the New Science, Engineering, and Mathematics Building. Specifically, the upgrade targeted changes to the existing chilled water pumps that now support the new heating, ventilation, and cooling (HVAC) equipment by increasing the flow of chilled water throughout the system to meet the heating and cooling needs of all users of this building.

 

Status: Completed

Project Costs: Measure J=$58,768

General Contractor: PPC Air Conditioning, Inc.

Engineering Records: P2S Engineering, Inc.

Program Management: MAAS Companies